About Energen Operations Investor Relations Corporate Social Responsibility EGN Foundation Art Show Careers
Permian Basin Operating Results Safety and Public Awareness Corporate Social Responsibility

Call Before Digging

Energen is a member of various one call systems.

For your safety, pipeline markers show the approximate location of pipelines and identify the companies that operate them. Pipeline markers may be anywhere along the right-of-way or directly over the pipeline. The pipeline may not follow a straight course between markers.

Prior to digging near our facilities, please call the number listed below for your state. Each state requires 48-hours notice to all facility owners and/or the appropriate pipeline location service prior to digging. The underground lines will be located and marked at no charge to you.

StateAgencyPhone Number
Colorado 
Utility Notification Center of Colorado811 or 800-922-1987
New MexicoNew Mexico One Call
811 or 800-321-2537
TexasTexas 811
811


Pipelines must be located before you:

  • Excavate, bore, tunnel, or operate heavy equipment near our rights-of-way
  • Install water, gas, sewer, power, telephone or similar utility lines across our rights-of-way
  • Conduct blasting operations near our facilities
  • Dredge or impound water within our rights-of-way
  • Erect structures or obstructions on our rights-of-way